• SKIP TO CONTENT
  • SKIP NAVIGATION
  • Patient Resources
    • COVID-19 Patient Resource Center
    • Clinical Trial Listings
    • What is Clinical Research?
    • Volunteering for a Clinical Trial
    • Understanding Informed Consent
    • Useful Resources
    • FDA Approved Drugs
  • Professional Resources
    • Research Center Profiles
    • Market Research
    • FDA Approved Drugs
    • Training Guides
    • Books
    • eLearning
    • Events
    • Newsletters
    • White Papers
    • SOPs
    • eCFR and Guidances
  • White Papers
  • Clinical Trial Listings
  • Advertise
  • COVID-19
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Home » Survey: Clinical data management delays are slowing study completion

Survey: Clinical data management delays are slowing study completion

September 21, 2017
CenterWatch Staff

One of the largest, most in-depth surveys of clinical digital management professionals shows that the time it takes companies to design and release clinical study databases is having a negative impact on conducting and completing trials.

According to the Tufts – Veeva 2017 eClinical Landscape Study report from Tufts Center for the Study of Drug Development, it takes companies an average of 68 days to design and release a clinical study database. Delays in releasing the study database lead to increased time for other data management processes, such as patient data entry and time to lock the database at the end of the study. Respondents that always deliver the database after first patient, first visit (FPFV), take nearly twice as long to enter patient data and about 75% longer to lock the study database when compared to those that never deliver the final database before FPFV.

“The study results indicate that companies face a growing number of challenges in building and managing clinical study databases,” said Ken Getz, research associate professor and director at the Tufts Center for the Study of Drug Development. “The results also show that the release of the clinical study database after sites have begun enrollment is associated with longer downstream cycle times at the investigative site and at study close out.”

EDC Providers and System Use

EDC is the most widely adopted clinical application, used by all respondents (100%), followed by randomization and trial supply management (77%), eTMF (70%), and safety (70%) systems. A majority (58%) of respondents use either Medidata Rave or Oracle Inform as their primary EDC system.

When asked about the types of data managed in their EDC, all (100%) CROs and sponsors cite electronic case report form (eCRF) data, followed by local lab and quality of life data (60% each). However, looking at the volume of data managed in the EDC shows companies primarily use their EDC system to manage eCRF data, demonstrating the need for processes and systems to support the industry’s vision to have complete study data in their EDC.

Impact of Database Build Delays on Trial Cycle Times

More than three-quarters (77%) say they have issues loading data into their EDC application and that EDC system or integration issues are the primary reasons they are unable to load study data (65%).

The survey finds several common causes for clinical database build delays. Protocol changes is most often cited by 45% of respondents, underscoring the challenge data management professionals have in dealing with changes as they are finalizing the clinical trial database for the start of the trial. This highlights the need to optimize the database design process with standards and systems that support more flexible design and rapid development.

Initial database delays also have significant downstream impacts on the time it takes sites to enter patient data in the EDC and the final lock of the database once the study is complete. When the database is always released before FPFV, data entry time is five days. When the database is released after FPFV, data entry time doubles to 10 days.

The impact of database build delays is even greater by the time companies get to database lock. Those who always release the database before FPFV get to database lock in an average of 31 days. Those who release the database before FPFV take more than three weeks longer (54 days) to lock the database.

Sponsors take roughly 40% longer than CROs to build the database (73 vs. 53 days) and to get to database lock (39 vs. 28 days). Those using the two leading EDC systems report roughly 25% longer data cycle times than those using other EDC systems, including time for database build (75 vs. 60 days), patient data entry (9 vs. 7 days), and database lock (39 vs. 32 days).

“Database build processes have remained largely unchanged over the past 10 years. This lengthy process will only get more complicated as CROs and sponsors manage an increasing variety of clinical trial data,” said Richard Young, vice president of Veeva Vault EDC. “Organizations compensate for technology limitations by reducing the volume of data they input. Our focus should be on improving EDC systems so sponsors and CROs are no longer limited, and instead can run the trial they want.”

The Tufts – Veeva 2017 eClinical Landscape Study: Assessing Data Management Practices, Performance, and Challenges report from Tufts Center for the Study of Drug Development and sponsored by Veeva Systems reviews the state of data management in life sciences with an in-depth look at the insights and opinions of clinical data management professionals at more than 250 companies, including sponsors and CROs, with an average of 16 years of experience.

Upcoming Events

  • 25Apr

    Effective Root Cause Analysis and CAPA Investigations for Drugs, Devices and Clinical Trials

  • 26Apr

    FDA’s New Laws and Regulations: What Drug and Biologics Manufacturers Need to Know

  • 27Apr

    Califf’s FDA, 2023 and Beyond: Key Developments, Insights and Analysis

  • 17May

    2023 WCG Avoca Quality Consortium Summit

  • 21May

    WCG MAGI Clinical Research Conference – 2023 East

Featured Products

  • Spreadsheet Validation: Tools and Techniques to Make Data in Excel Compliant

    Spreadsheet Validation: Tools and Techniques to Make Data in Excel Compliant

  • Surviving an FDA GCP Inspection

    Surviving an FDA GCP Inspection: Resources for Investigators, Sponsors, CROs and IRBs

Featured Stories

  • tablet

    Digital Intake Platforms Effective as Source of Trial Information, Survey Shows

  • Diversity-360x240.png

    Site Spotlight: EmVenio Research Takes to the Road to Promote Trial Diversity

  • Five Ws

    Consider the Five ‘W’s to Understand Potential Participants

  • QandA-360x240.png

    Perspectives from Smaller-Sized CROs: Q&A with Cheryle Evans

Standard Operating Procedures for Risk-Based Monitoring of Clinical Trials

The information you need to adapt your monitoring plan to changing times.

Learn More Here
  • About Us
  • Contact Us
  • Privacy Policy
  • Do Not Sell or Share My Data

Footer Logo

300 N. Washington St., Suite 200, Falls Church, VA 22046, USA

Phone 617.948.5100 – Toll free 866.219.3440

Copyright © 2023. All Rights Reserved. Design, CMS, Hosting & Web Development :: ePublishing